Energy Saving 600Kg/H Industrial Desiccant Dryers For Plastics
Product Details:
Place of Origin: | CHINA |
Brand Name: | JIN MACHINE |
Certification: | CE;SGS;ISO9001 |
Model Number: | CSG-3000 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 Set |
---|---|
Price: | Negotiable |
Packaging Details: | Standard wooden frame and wooden case is available for Jin Machine Excellent Rigid Packaging drying dryer for plastic recycling |
Delivery Time: | 25 work days |
Payment Terms: | T/T, L/C, D/A, D/P, Western Union, MoneyGram |
Supply Ability: | 10 sets per month |
Detail Information |
|||
Product: | Plastic Material Dryer | Throughput: | 600 Kg/h |
---|---|---|---|
Hooper Structure: | Double Isulation | Controler: | Simens PLC |
Dew Point: | -30-70℃ | Production Period: | 30 Days |
High Light: | 600Kg/H Industrial Desiccant Dryers,Energy Saving Industrial Desiccant Dryers,600Kg/H Desiccant Dryers For Plastics |
Product Description
Energy Saving 600Kg/H Industrial Desiccant Dryers For Plastics
Energy Saving Plastic Pellet Dryer / Industrial Desiccant Dehumidifier
1.Product Description for energy saving plastic pellet dryer
CSG series is a fully automatic drying system with zeolite desiccant beds, which can be used with Hopper Bank Series and multi-hopper systems. It can adapt and automatically control operating parameters in the light of type and quantity of polymer.Compared with the traditional dryer, it saves 40% of the energy.
1. Ease of maintenance with access process, regeneration and air filters
2. Self-adaptive PID temperature control from 60℃ to 300℃
3. No use of cooling water
4. No moving or rotating internal parts
5. No need of manual control, full auto-adaptive operation
6. On-board heating unit on hopper
7. Anti-stress function protecting polymers against overheating
8. Sturdy, well proven design for extended operational life
9. Visual and audible alarms available
10. Automatic dew point control system: not switch to new desiccant bed before the dew point gets -30°C
2.Main Technical Parameters
Model | Volume(L) | Capability(kg) | Dry Fan(KW) | Rebirth Fan(KW) | Drying Heating(KW) | Rebirth Heating(KW) | Material | Heating source | Drying Material |
CSG-315 | 315 | 200 | 3 | 0.37 | 15 | 7.5 | 304 Stainless Steel | Electricity | Molecular Seive |
CSG-800 | 800 | 500 | 5.5 | 1.1 | 24 | 12 | 304 Stainless Steel | Electricity | Molecular Seive |
CSG-1600 | 1600 | 1000 | 7.5 | 1.5 | 36 | 18 | 304 Stainless Steel | Electricity | Molecular Seive |
CSG-3200 | 3200 | 2000 | 18.5 | 3 | 54 | 27 | 304 Stainless Steel | Electricity | Molecular Seive |
Zeolite tribler design with three desiccant cartridges and three pump technology: two dedicated to process air production and one for saturated tower regeneration for a continuous dry air flow, automatic regeneration and cooling phase.
1. High-performance 3-bed
2. Three pumps
3. Dew point -30℃ to -70℃, dewpoint monitor
4. Dedicated to large-scale production up to 1200kg/h
3.FAQ
Q1: Which city are you in? How can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are a factory, manufacturing mainly plastic dryer machines. We offer turnkey solutions including conveying, drying and mixing with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally no more than 40 working days.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory.
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 2 days for dryers and 15 days for central conveying system.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.
Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintaince.
Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.