Double Screw 350kg/h Plastic Strap Production Line For Packing Belt
Product Details:
Place of Origin: | CHINA |
Brand Name: | JIN MACHINE |
Certification: | CE;SGS;ISO9001 |
Model Number: | JIN-SJPET-33 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 Set |
---|---|
Price: | Negotiable |
Packaging Details: | Standard wooden frame and wooden case is available for Jin Machine Excellent Rigid Packaging drying dryer for plastic recycling |
Delivery Time: | 45 work days |
Payment Terms: | T/T, L/C, D/A, D/P, Western Union, MoneyGram |
Supply Ability: | 10 sets per month |
Detail Information |
|||
Product Name: | PET Strap Production Line | Raw Material: | PET Flakes Or Granules |
---|---|---|---|
Capacity: | 350 Kg / H | Application: | Plastic Strap/band/packing |
Material: | SUS 304 Stainless Steel | Warranty: | 12 Months |
Power: | 80- 200Kw | Motor: | Siemens Brand |
Production Period: | 45 Days | ||
High Light: | 350kg/h Plastic Strap Production Line,Double Screw Plastic Strap Production Line,Plastic Strap Production Line For Packing |
Product Description
Double Screw 350kg/h Plastic Strap Production Line For Packing Belt
High Speed 350 kg/h plastic strap making machine Double Screw Design For Packing Belt
1.Product Description for plastic strap making machine:
1. Special twin screw extrusion technology and single screw extrusion technology can be choosing as per client needs.
2. Process 100% recycled PET bottle flakes or pellets.
3. Even plasticization and stable extrusion with PLC automatic control for the full line.
4. As per different requirements, changing a coating materials for make strap have better and special function. For example, the strap for packing cotton can be from enhancing the breaking strength and joint strength when welding strap.
2.Parameter of the plastic strap making machine:
Model | JIN-SJ 65/33 | JIN-SJ-5/33 | |
Main Motor | 22kw | 37kw | |
Capacity | around 50-100kgh | around 100-150kgh | |
Width | 5mm-19mm, 19mm-25mm adjustable | ||
Thickness | 0.6-1.2mm, adjustable |
3.FAQ:
Q: What is your delivery time?
A: Normally, it needs about 45 days. The exact time depends on production management.
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q: What about after service?
A: We can offer 24months warrant since the machinery arrived at your factory except for durable parts. After warrant, we will offer space parts or repair service with or without charges.